Commissioning of:
1. Electrical installation and equipment up to and over 1000V
- resistance of protecive earthing systems
- insulation resistance
- resistance of lightning protective earthing systems
- power frequency withstand tests
- transition resistanece in contact systems
2. Electrical installation and the equipment next to 1000 V
- Ipmedance of phase-protective conductor circuit
- Earth leakage circuit breakers
3. Safety equipment: isolate bars (manipulation, measuring, for portable grounding); isolated clamps; voltage detectors; current clamps; protective gloves, protective boots and galoshes; dielectric carpets and paths.
- electrical insulation strenght by increased AC test voltage
4.Cable power lines up to 20 kV
- insulation resistance
- electrical insulation strenght by increased AC test voltage
5. Capacitor installation up to and over 1000V
- current value and uniformity of the load of the invidual phases
- no housing connectionabsence of body compound
6. Transformers up to and including 400kv
- insulation Resistance
- power frequency withstand tests
- active winding resistance
- transformer oil – breakdown voltage
- transformer ratio
- polarity check
7. Relay protection devices, electrical automation, telemechanics and secondary circuits
- check of relay protection settings (direct or alternative(start up and return) current, direct or alternative(start up and return) voltage, time delay, impedance(start up and return))
- functional test (correct, incorrect act or functioning fail of the device)
8. Electric motors for direct and alternative current
- insulation resistance
- HV withstand tests
- active winding resistance (stators and rotors)
- power and idle losses
9. Power measurement transformers up to 400kV