CLIENT | PROJECT / OBJECT / TYPE OF WORK |
"Heat and Power Supply - Sofia" AD |
“Heat and Power Supply - Sofia” AD |
“Schneider Electric” Bulgaria |
PortBourgas– design for execution and revision of cable entry for 2panels SM6 DM1-W, erection oflow voltage superstructure of 450mmforSepam 1000+ andrelay protection Sepam 1000+ |
“Energotechnika” Ltd |
“Heat and Power Supply - Sofia” Co |
NEK AD |
"Maritza Iztok 2"TPP- erection anddelivery of 4 fully equipped relay panels for bays |
NEK AD - "Trafoelectro-invest" |
Erection of17 cubiclesforpower supply oftelemechanical and high frequency equipment |
Kibernetika OOD |
“Heat and Power Supply – Sofia” Co "Zemliane" - deliveryofmaterialsanderection worksforthe systemfor control ofthermo hydraulicprocess |
NEK EAD, |
"Petrohan" Dam - erectionof distribution board anddistributionboxes |
NEK AD - "Trafoelectro-invest" |
"MaritzaIztok 2" TPP, "MaritzaIztok 3" TPP, "Kozlodui"NPP- Installation andconnection toSCADAsystem ofconverterforgenerator voltagemeasuringofthe generators in power plants |
NEK AD |
"MaritzaIztok 2" TPP- design for replacement of circuit breakers, disconnectors, measuring transformers and surge arresters in 400 kV switchgear, revision of secondary connection part and supervision during construction works |
NEK AD |
TPP "Varna" Substation, "VarnaNorth" substation |
DEVEN JSCo, |
"Deven"TPP- Design for 20/6kV switchgear rehabilitation; “Relay protection and automation”design |
“Kozloduy” NPP |
"NPPKozloduy" - Design, delivery and replacement of incomer breakers in sections 0,4 kV. |
VA TEH Elin EBG Gmbx&Co branch Sofia |
"SandanskaBistritza"Cascade - Rehabilitation |
Schneider ElectricBulgaria |
„Ruse” TPP- Manufacture of 0,4 kV PRISMA P panels |
NEK EAD - Branch "Rodopi" HPP |
"Peshtera" TPP- HG5- delivery, erection and commissioning of primary and secondary connection systems. |
NEK AD |
"GornaOriahovitza" Substation– Design for execution ofbus - bar protection |
NEK AD |
"Burgas" Substation, "Metalurgichna" Substation - Design for execution of BFP system in 400kV switchyards |
NEK AD |
"Maritza 3" TPP, Dimitrovgrad -Design for execution of bus - bar protection system - 110 kV switchyards |
NEK AD |
"Kneja" Substation - Design for execution for bus coupler of bus-bar system 110kV |
NEK EAD - Branch "Rodopi" HPP |
HPP "Krichim" - Manufacturing, delivery, erection, commissioningandputtingintooperationofpanelsfor 110 kV, 20 kV and 10,5 kV switchgears, controlroom; Designandco-ordination of projects |
NEK AD - "Trafoelectro-invest" |
„MaritzaIztok 2” TPP 400kV switchyard -engineering of panels for MV DC Switchgear in control room |
NEK EAD - Branch "Rodopi" HPP |
HPP "Aleko", HPP "Devin" - Design for execution of parts “Primary” and “Secondary” connections for replacement of power switches and metering transformers in 110 kV switchyard. |
TelekontrolLtd |
" MaritzaIztok Mines" - remotecontrolsystem ofS/S “G.Mihailov”, S/S”2B”, S/S” 3thMarch”, S/S “Zapad”, S/S “Izgrev”, S/S”Ugna”, S/S “Gledachevo”, S/S “Gipsovo”, S/S “1”, “7”, “8”, S/S “CRB”. |
SIEMENSLtd, |
"PlovdivSouth" 400/220/20kV Substation - Reconstructionand design for execution for parts “Civil works”, “Primary” and “Secondary”connections |
Schneider ElectricBulgaria |
National electrical company -10kVSwitchgear - Design of switchgear and automatic change-over system |
Consortium, |
"Cherven briag"Substation - Design of earthing and lightning installationsfor 110kV switchyard and 20kV switchgear |
NEK AD |
"Gabrovo"Substation- Design for execution for area lightingand lighting of 110 kV switchyards. |
“Kozloduy” NPP |
"Kozloduy" NPP - Design for execution for replacement of metering transformers in 110, 220, 400 kV switchyards |
NEK AD |
„Madjarovo”Substation- Design for execution of 20kV switchgear rehabilitation |
NEK AD |
„Slaviani”Substation- Reconstruction of auxiliary power supply 220V DC, new battery and replacement of the relay protections of 110kV and 20kV feeders |
SIEMENSLtd, |
"Biala" Substation110/20kV– design for execution for parts “Civil works”, “Primary connection” and “Secondary connection”. |
ABB Ltd. |
"TargovishteZapad" Substation 110/20kV– erection of substation for power supply of the glass factories ”Trakia glass Bulgaria”LTD, - Targovishte – design for execution for parts “Architecture”, “Civil works”, “Primary connection” and “Secondary connection”, manufacture of panels, commissioning, putting in operation. |
ABB Ltd. |
"Kaliakra" Substation– design for execution for construction of wind power station near the village of Balgarevo. |
Schneider ElectricBulgaria |
"Pleven"TPP-New 11,5kV Switchgear |
NEK AD |
“TPP - switchyard „Maritza Iztok” Substation Manufacture and delivery of 4 control panels; coupler, measure I bus coupler, measure II bus coupler. |
NEK EAD, P “Trafoelektroin vest” |
“Varna” TPP -Rehabilitation 220 kV switchyards |
NEK EAD, P “Trafoelektroin vest” |
“Bobov dol”TPP -Rehabilitation 110 and 220 kV switchyards, design to AC parts of build - engineering works |
NEK AD |
”Zlatograd” S/s, “Smolian” S/s, “Severni Rodopi” S/s, “Velingrad” S/s – design for executions for mounting of digital relay protections for VL 110 kV and PT 110/20 kV |
ABB Ltd. |
“Trakata” Substation 110/20 kV - commissioning, 20, 110kVswitchyard, MV switchyard |
NEK AD |
“Varna Zapad” Substation -Delivery of equipped control panels for rehabilitation of 110 kV switchyard |
“Kozloduy” NPP |
"NPPKozloduy" - Designfor new supports and foundations for replacement of metering transformers in 400 kV switchyards |
Monbat Ltd |
"Monbat"Ltd- Reconstruction of 2 20kV switchgears |
NEK EAD, P “Trafoelektro - |
“GornaOriahovica” Substation- Rehabilitation of 110kV and 220kV switchyards |
NEK EAD - Branch "Rodopi" HPP |
“Orfei” PSHPP - engineering works of second battery and DC power supply splitting. |
NEK EAD, P “Trafoelektro - |
“TPP Varna” Substation - Rehabilitation 220 kV switchyards - engineering |
NEK EAD, P “Trafoelektro - |
„Aleko”Substation- Rehabilitation of 110kV and 220kV switchyards – design, erection and commissioning |
NEK EAD, P “Trafoelektro - |
“Stolnik” Substation - Rehabilitation 220 kV switchyards -engineering works- design for execution for secondary connection and manufactures of local control panels |
NEK EAD, P“Trafoelektro - |
“Tutrakan” Substation- 110 kV switchyardsextension-engineering works- Design, delivery, erection and putting into exploitation ofsecondary connection system for 110 kV bus bar and “Pelikan” outgoing line |
NEK EAD |
NEK EAD- Preliminary design of information, power and measurement circuit and devices in energy metering panel. Several versions. |
NEK EAD, P “Trafoelektro- |
“Targoviste Zapad” Substation – engineering works - connection to “Malnia” OHL |
Deven Co, |
"Deven" TPP- 6,3kV switchgear rehabilitation - design |
NEK EAD, |
NEK EADCD- Reconstruction and rehabilitation of 0,4 kV switchyard, located in the building of NEK EAD- engineeringworks |
NEK EAD - Branch "Rodopi" HPP |
HPP “Pestera”- Design, delivery, erection and putting into operation oftrade and controlmeasurement systemsin MV cells - 20kV and 10,5 kV |
NEK EAD, |
„Varna” Substation 750kV - Rehabilitation of 400kV switchyard |
„Triera 55” |
Kavarna- Commissioning of 20kV switchyard |
NEK EAD |
Rehabilitation of 220kV and 400kV relay protections of 23 substations and power plants in Bulgaria - design, erection and commissioning |
NEK EAD |
“Studenkladenec” HPP- Rehabilitation of 110kV switchyard and 10,5kV switchgear - design, erection and commissioning |
NEK EAD |
“Ivailovgrad” HPP- Rehabilitation of 110kV switchyard and 10,5kV switchgear - design, erection and commissioning |
NEK EAD |
“Kardjali”HPP- Rehabilitation of 110kV switchyard and 10,5kV switchgear - design, erection and commissioning |
INOS 1 Ltd CEGELEC |
Kaliakra Substation- design, erection and commissioning |
Toplofikatzia Pleven |
Toplofikatzia Pleven – Connection of 110/11,5/6,3kV switchyard to the electrical grid - design |
“Consortium |
Gorna Oriahovitza Substation- Rehabilitation of 220kV switchyard |
NEK EAD, |
Maritza Iztok 3 TPP– 400kV switchyard preparation for SCADA systemintegrations |
NEK EAD, |
Bobov dol TPP - Rehabilitation of 220kV and 110kV switchyardsand construction of the new control room |
NEK EAD, |
Sofia Zapad Substation, 400kV Switchyard, Column №4 control cubicles – secondary connection design and commissioning |