Time Period 2008-2012
CLIENT | PROJECT / OBJECT / TYPE OF WORK |
NEK EAD,
P “Trafoelektro - |
Sofia Zapad Substation, 400kV Switchyard, Column №4 control cubicles – secondary connection design and commissioning |
“Consortium |
Golden sands” S/s 110/20kV - Reconstruction |
CarrefourAD |
Hermes ParkSofia – design of power supply of Trade Centre |
NEK EAD P “Trafoelektro - |
„Golden sands” S/s - 20kV Switchgear – circuit breakers replacement and Secondary connection – engineering works |
NEK EAD |
“Chervena Mogila” S/s–400kV Switchyard rehabilitation |
NEK EAD |
„TPPBobov Dol” S/s- 220кV Switchyard rehabilitation and 110kV Switchyard reconstruction |
NEK EAD |
„Chervena mogila”S/s- 400kV and 110kVSwitchyards – engineering of control panels |
NEK EAD |
„TPP Republika” – civil works - engineering |
NEK EAD, |
Bobov dol TPP - Rehabilitation of 220kV and 110kV switchyardsand construction of the new control room |
NEK EAD |
„Rousse” S/s 110/20 kV - 20 kV Switchgear – civil engineering works |
COMPLETED PROJECTS AND TASK IN FOREIGN COUNTRIES
Year 2009 |
||
CUSTOMER |
PROJECT /OBJECT |
|
Hyundai Heavy Industries
|
1."Zayat" S/s, Egypt- Cooling cabinet and local control cabinet for power transformers 2.Tunizia - Cubicles for local control of power transformers 3."Sharm El Sheikh" S/s, Egypt - Cooling cabinet and local control cabinet forpower transformer |
|
Year 2008 |
||
CUSTOMER |
PROJECT /OBJECT |
|
Hyundai Heavy Industries
|
1. Greece- Cooling cabinet and local control cabinet for power transformers 2. England - Cooling cabinet and local control cabinet for power transformers 3. India - Cooling cabinet and local control cabinet for power transformers; cubicles for remote control 4. Egypt, Bahteem - Cooling cabinet and local control cabinet for power transformers 5. Ireland - Cooling cabinet and local control cabinet for power transformers 6. Fuiarah, United Arab Emirates – Cooling cabinet and local control cabinet for power transformers 7. France - Cooling cabinet and local control cabinet for power transformers |
|
Year 2007 |
||
CUSTOMER |
PROJECT /OBJECT |
|
Hyundai Heavy Industries
|
1. „Alstom” - "Sotto de Ribera" S/s, Spain – Cooling cabinet and local control cabinet for power transformers 2. Tanzania– Cooling cabinet and local control cabinet for power transformers 3. Pakistan - Cooling cabinet and local control cabinet for power transformers 4. Ghana - 8pcs power transformers- Cooling cabinets and local control cabinets 5. Cuba - Cooling cabinet and local control cabinet for power transformers 6. „Kadafe” S/S,Venezuela - Cooling cabinet and local control cabinet for power transformers 7. Morocco - Cooling cabinet and local control cabinet for power transformers |
|
Year 2006 | ||
CUSTOMER |
PROJECT /OBJECT |
|
Hyundai Heavy Industries |
|
|
Year 2005 | ||
CUSTOMER |
PROJECT /OBJECT |
|
Hyundai Heavy Industries |
1. Malaysia -Cooling cabinets and local control cabinets,relay protection cubicles for power transformers 11/132kV |
|
Year 2000 | ||
CUSTOMER |
PROJECT /OBJECT |
|
Hyundai Heavy Industries |
1. Livan - New power transformer 150/66kV - Design and commissioning works |
Time period 1992-1995
CLIENT |
PROJECT / OBJECT / TYPE OF WORK |
“Kremikovtsi”AD |
S/S GPP1 - design, commissioning of relay protections if 110 kV “Bogorov-East” и “Bogorov-West” |
NEK EAD |
S/S “Vetren” 400 kV - electrical design of cubicles for relay protection 400 kV;Electrical engineering and commissioning of secondary connections. |
NEK EAD |
S/S “Mizia” - Switch yard 400kV - project for secondary relay protection 400kV; Primary relay protection commissiong of power transformer 400/220/110кV; Fault recorders set up. |
NEK EAD "Eletrosnabdiavane" Pazardzhik |
Electrical installations, Commissioning work, As build documentation of ASDC in seven substations 110/20 kV |
“Kremikovtsi” AD |
TPP “Kremikovtsi” - electrical installation, engineering and commissioning of circuit breaker |
NEK EAD |
S/S “Tsarevets” - switch yard 400 kV - electrical design and engineering of cabinets for relay protections power line 400kV and autotransformer. Fault recorders set up. |
NEK EAD |
Electrical installation, design and commissioning of registering equipment OSCILLOSTORE P531 - SIEMENS for 10 S/S 400kV |
BTC |
KRTC "Kopito" - Electrical design, electrical installations , commissing work of ASO, Emergency Lights |
NEK EAD |
S/S "Varna" 750/400/15,75кV - expansion whit shunt reactor 200МVА, 420кV - electrical design - secondary connections and engineering of relay protections |
NEK EAD "Trafoelektroinvest" |
S/S "Sofia - West” 400/110/31,5кV - expansion whit shunt reactor 200МVА, 420кV - electrical design - secondary connections and engineering of relay protections |
NEK EAD "Trafoelektroinvest" |
HPP "Topolnitsa" - electrical installation and commissioning work for switch yard 20 kV |
NEK EAD |
S/S "Dimitar Dimitrov" - Commissioning of switch yard 110 kV |
NEK EAD |
S/S "Cherni vrah" - Electrical desing for remote controling |
Time period 2004-2007
CLIENT | PROJECT / OBJECT / TYPE OF WORK |
"Heat and Power Supply - Sofia" AD |
“Heat and Power Supply - Sofia” AD |
“Schneider Electric” Bulgaria |
PortBourgas– design for execution and revision of cable entry for 2panels SM6 DM1-W, erection oflow voltage superstructure of 450mmforSepam 1000+ andrelay protection Sepam 1000+ |
“Energotechnika” Ltd |
“Heat and Power Supply - Sofia” Co |
NEK AD |
"Maritza Iztok 2"TPP- erection anddelivery of 4 fully equipped relay panels for bays |
NEK AD - "Trafoelectro-invest" |
Erection of17 cubiclesforpower supply oftelemechanical and high frequency equipment |
Kibernetika OOD |
“Heat and Power Supply – Sofia” Co "Zemliane" - deliveryofmaterialsanderection worksforthe systemfor control ofthermo hydraulicprocess |
NEK EAD, |
"Petrohan" Dam - erectionof distribution board anddistributionboxes |
NEK AD - "Trafoelectro-invest" |
"MaritzaIztok 2" TPP, "MaritzaIztok 3" TPP, "Kozlodui"NPP- Installation andconnection toSCADAsystem ofconverterforgenerator voltagemeasuringofthe generators in power plants |
NEK AD |
"MaritzaIztok 2" TPP- design for replacement of circuit breakers, disconnectors, measuring transformers and surge arresters in 400 kV switchgear, revision of secondary connection part and supervision during construction works |
NEK AD |
TPP "Varna" Substation, "VarnaNorth" substation |
DEVEN JSCo, |
"Deven"TPP- Design for 20/6kV switchgear rehabilitation; “Relay protection and automation”design |
“Kozloduy” NPP |
"NPPKozloduy" - Design, delivery and replacement of incomer breakers in sections 0,4 kV. |
VA TEH Elin EBG Gmbx&Co branch Sofia |
"SandanskaBistritza"Cascade - Rehabilitation |
Schneider ElectricBulgaria |
„Ruse” TPP- Manufacture of 0,4 kV PRISMA P panels |
NEK EAD - Branch "Rodopi" HPP |
"Peshtera" TPP- HG5- delivery, erection and commissioning of primary and secondary connection systems. |
NEK AD |
"GornaOriahovitza" Substation– Design for execution ofbus - bar protection |
NEK AD |
"Burgas" Substation, "Metalurgichna" Substation - Design for execution of BFP system in 400kV switchyards |
NEK AD |
"Maritza 3" TPP, Dimitrovgrad -Design for execution of bus - bar protection system - 110 kV switchyards |
NEK AD |
"Kneja" Substation - Design for execution for bus coupler of bus-bar system 110kV |
NEK EAD - Branch "Rodopi" HPP |
HPP "Krichim" - Manufacturing, delivery, erection, commissioningandputtingintooperationofpanelsfor 110 kV, 20 kV and 10,5 kV switchgears, controlroom; Designandco-ordination of projects |
NEK AD - "Trafoelectro-invest" |
„MaritzaIztok 2” TPP 400kV switchyard -engineering of panels for MV DC Switchgear in control room |
NEK EAD - Branch "Rodopi" HPP |
HPP "Aleko", HPP "Devin" - Design for execution of parts “Primary” and “Secondary” connections for replacement of power switches and metering transformers in 110 kV switchyard. |
TelekontrolLtd |
" MaritzaIztok Mines" - remotecontrolsystem ofS/S “G.Mihailov”, S/S”2B”, S/S” 3thMarch”, S/S “Zapad”, S/S “Izgrev”, S/S”Ugna”, S/S “Gledachevo”, S/S “Gipsovo”, S/S “1”, “7”, “8”, S/S “CRB”. |
SIEMENSLtd, |
"PlovdivSouth" 400/220/20kV Substation - Reconstructionand design for execution for parts “Civil works”, “Primary” and “Secondary”connections |
Schneider ElectricBulgaria |
National electrical company -10kVSwitchgear - Design of switchgear and automatic change-over system |
Consortium, |
"Cherven briag"Substation - Design of earthing and lightning installationsfor 110kV switchyard and 20kV switchgear |
NEK AD |
"Gabrovo"Substation- Design for execution for area lightingand lighting of 110 kV switchyards. |
“Kozloduy” NPP |
"Kozloduy" NPP - Design for execution for replacement of metering transformers in 110, 220, 400 kV switchyards |
NEK AD |
„Madjarovo”Substation- Design for execution of 20kV switchgear rehabilitation |
NEK AD |
„Slaviani”Substation- Reconstruction of auxiliary power supply 220V DC, new battery and replacement of the relay protections of 110kV and 20kV feeders |
SIEMENSLtd, |
"Biala" Substation110/20kV– design for execution for parts “Civil works”, “Primary connection” and “Secondary connection”. |
ABB Ltd. |
"TargovishteZapad" Substation 110/20kV– erection of substation for power supply of the glass factories ”Trakia glass Bulgaria”LTD, - Targovishte – design for execution for parts “Architecture”, “Civil works”, “Primary connection” and “Secondary connection”, manufacture of panels, commissioning, putting in operation. |
ABB Ltd. |
"Kaliakra" Substation– design for execution for construction of wind power station near the village of Balgarevo. |
Schneider ElectricBulgaria |
"Pleven"TPP-New 11,5kV Switchgear |
NEK AD |
“TPP - switchyard „Maritza Iztok” Substation Manufacture and delivery of 4 control panels; coupler, measure I bus coupler, measure II bus coupler. |
NEK EAD, P “Trafoelektroin vest” |
“Varna” TPP -Rehabilitation 220 kV switchyards |
NEK EAD, P “Trafoelektroin vest” |
“Bobov dol”TPP -Rehabilitation 110 and 220 kV switchyards, design to AC parts of build - engineering works |
NEK AD |
”Zlatograd” S/s, “Smolian” S/s, “Severni Rodopi” S/s, “Velingrad” S/s – design for executions for mounting of digital relay protections for VL 110 kV and PT 110/20 kV |
ABB Ltd. |
“Trakata” Substation 110/20 kV - commissioning, 20, 110kVswitchyard, MV switchyard |
NEK AD |
“Varna Zapad” Substation -Delivery of equipped control panels for rehabilitation of 110 kV switchyard |
“Kozloduy” NPP |
"NPPKozloduy" - Designfor new supports and foundations for replacement of metering transformers in 400 kV switchyards |
Monbat Ltd |
"Monbat"Ltd- Reconstruction of 2 20kV switchgears |
NEK EAD, P “Trafoelektro - |
“GornaOriahovica” Substation- Rehabilitation of 110kV and 220kV switchyards |
NEK EAD - Branch "Rodopi" HPP |
“Orfei” PSHPP - engineering works of second battery and DC power supply splitting. |
NEK EAD, P “Trafoelektro - |
“TPP Varna” Substation - Rehabilitation 220 kV switchyards - engineering |
NEK EAD, P “Trafoelektro - |
„Aleko”Substation- Rehabilitation of 110kV and 220kV switchyards – design, erection and commissioning |
NEK EAD, P “Trafoelektro - |
“Stolnik” Substation - Rehabilitation 220 kV switchyards -engineering works- design for execution for secondary connection and manufactures of local control panels |
NEK EAD, P“Trafoelektro - |
“Tutrakan” Substation- 110 kV switchyardsextension-engineering works- Design, delivery, erection and putting into exploitation ofsecondary connection system for 110 kV bus bar and “Pelikan” outgoing line |
NEK EAD |
NEK EAD- Preliminary design of information, power and measurement circuit and devices in energy metering panel. Several versions. |
NEK EAD, P “Trafoelektro- |
“Targoviste Zapad” Substation – engineering works - connection to “Malnia” OHL |
Deven Co, |
"Deven" TPP- 6,3kV switchgear rehabilitation - design |
NEK EAD, |
NEK EADCD- Reconstruction and rehabilitation of 0,4 kV switchyard, located in the building of NEK EAD- engineeringworks |
NEK EAD - Branch "Rodopi" HPP |
HPP “Pestera”- Design, delivery, erection and putting into operation oftrade and controlmeasurement systemsin MV cells - 20kV and 10,5 kV |
NEK EAD, |
„Varna” Substation 750kV - Rehabilitation of 400kV switchyard |
„Triera 55” |
Kavarna- Commissioning of 20kV switchyard |
NEK EAD |
Rehabilitation of 220kV and 400kV relay protections of 23 substations and power plants in Bulgaria - design, erection and commissioning |
NEK EAD |
“Studenkladenec” HPP- Rehabilitation of 110kV switchyard and 10,5kV switchgear - design, erection and commissioning |
NEK EAD |
“Ivailovgrad” HPP- Rehabilitation of 110kV switchyard and 10,5kV switchgear - design, erection and commissioning |
NEK EAD |
“Kardjali”HPP- Rehabilitation of 110kV switchyard and 10,5kV switchgear - design, erection and commissioning |
INOS 1 Ltd CEGELEC |
Kaliakra Substation- design, erection and commissioning |
Toplofikatzia Pleven |
Toplofikatzia Pleven – Connection of 110/11,5/6,3kV switchyard to the electrical grid - design |
“Consortium |
Gorna Oriahovitza Substation- Rehabilitation of 220kV switchyard |
NEK EAD, |
Maritza Iztok 3 TPP– 400kV switchyard preparation for SCADA systemintegrations |
NEK EAD, |
Bobov dol TPP - Rehabilitation of 220kV and 110kV switchyardsand construction of the new control room |
NEK EAD, |
Sofia Zapad Substation, 400kV Switchyard, Column №4 control cubicles – secondary connection design and commissioning |
Time period 1996-1999
CLIENT | PROJECT / OBJECT / TYPE OF WORK |
NEK AD - "Trafoelectro-invest" |
Main control center - Erection and commissioning of SCADA system in fourteen substations |
"Heat and Power Supply - Sofia" AD |
"Sofia - Iztok" TPP - Design of spare power supply of heating installations |
АВВ Ltd. |
"Chaika" Substation - Design, erection and commissioning of 110 kV switchgear - secondary connection and SCADA system |
NEK AD - "Trafoelectro-invest" |
"Asenovgrad" Substation - Design, erection and commissioning of AC and DC auxiliary power supply panels, control and relay panels |
VMZ- AD - Sopot |
"Karnare" Substation - Design, erection and commissioning of relay panel for 110/20 kV power transformer |
NEK AD - "Trafoelectro-invest" |
"Bononia" Substation - Design, erection and commissioning of control and relay panels, commissioning of 110 kV switchyard |
NEK AD |
“Kozloduy” NPP - commissioning of 110 kV overhead transmission line "Raketa" |
NEK AD - "Trafoelectro-invest" |
"Vidin 1" Substation - Design, erection and commissioning of relay panels for four 110 kV overhead transmission lines |
NEK AD - "Trafoelectro-invest" |
"Vidin 2" Substation - Design, erection and commissioning of control and relay panels and marshalling boxes, commissioning of 110 kV switchyard |
NEK AD - "Trafoelectro-invest" |
"Pioner" Substation - Commissioning of 110 kV switchyard and 20 kV and 10 kV switchgear |
NEK AD - "Trafoelectro-invest" |
"Plovdiv - Center" Substation - Design, erection and commissioning of AC and DC panels, control and relay panels |
NEK AD |
“Kozloduy” NPP - commissioning of generator circuit breakers in BGT - 7 and BGT - 8 - block IV |
"Petrohan" television center |
Erection and commissioning of 20 kV switchgear - manufactured by ABB |
"Trafel" AD |
"Sofia - Iztok" TPP - Design for reconstruction of 110 kV switchyard |
"Heat and Power Supply - Sofia" AD |
"Zemliane" Heat and Power Supply - Erection and commissioning of relay protections for power transformers |
"Enemona M" - Kozloduy |
“Kozloduy” NPP - Commissioning of 220 kV and 400 kV switchyards. Replacement of circuit breakers of feeders 3, 5, 19, 21, 35, 47. |
"Trafel" AD |
"Sofia - Iztok" TPP - Commissioning of 110 kV switchyard |
"Trafel" AD |
"Sofia - East" TPP - Design of SCADA system of 110 kV switchyard |
VMZ- AD - Sopot |
"Karnare" Substation - setting of 110 kV overhead transmission line relay protections |
"Heat and Power Supply - region Lulin" |
“Moderno predgradie” Heat and Power Supply - replacement of 6.3 kV Motor protections by static relay protections - ABB supply |
“Heat and Power Supply - V.Tarnovo” |
“V. Tarnovo” Termal Power Supply - Design, erection and commissioning of capacitor bank and supervision of steam boilers air fans upgrade - supplier “Group Schneider” |
"Trafel" AD |
"Sofia - East" TPP - Design of Underfrequency Protection (Load shedding) |
"Heat and Power Supply - region Lulin" |
"Luilin" Heat and Power Supply - replacement of motor protections with static ones, delivered by АВВ - design, erection and commissioning |
"Trafel" AD |
”Sofia - East” TPP - Execution of the project for remote supervisory control of 110 kV switchyard |
DSK Bank AD |
DSK Bank-Central Administration -Sofia - Power electrical installation for supply of computer network: assembling and erection of switchboards and cables. Design, erection and testing of computer network earthing |
VMZ- AD - Sopot |
“Sopot” Substation - 110 kV Switchyard - Design - primary and secondary connection |
STCT “Electrotransport” “Transenergy” -section |
“Pioner” Substation - 10 kV Switchgear - Equipment supply erection and commissioning works. |
“Geovodengineer-ing” Ltd., |
“Freshwater fish breeding” - Plovdiv –Power supply of 22 kW pumps |
"Heat and Power Supply - Sofia" AD |
"Zemliane" Heat and Power Supply – Reconstruction of 6 kV switchgear, 220 VDC auxiliary supply and new mimic diagram - design |
“Tehnomilk” AD, Sofia |
Department for manifacturing of milk production of “ELBI Bulgaricum” – indoor electrical installations - Vidin |
Munition Factory “Sopot” |
“Sopot” Substation - 110 kV Switchyard - erection and commissioning works. |
"Trafel" AD |
“Kozloduy” NPP - Replacement of circuit breakers – erection and commissioning works in 220 kV switchyard, feeders No.1, 7 and 15 |
NEK AD - "Trafoelectro-invest" |
“Tzarevetz” Substation- Commissioning and putting into operation of Transformer T2 400/110/31,5 kV |
“Sofia - East” TPP |
"Sofia - East” TPP -Reconstruction works - Design, deliveries, erection works (secondary connection) and commissioning of 6 kV switchgear, TG4, 0,4 kV Auxiliary supply, 6 kV ATS and 0,4 kV ATS |