Time Period 2008-2012
CLIENT | PROJECT / OBJECT / TYPE OF WORK |
NEK EAD,
P “Trafoelektro - |
Sofia Zapad Substation, 400kV Switchyard, Column №4 control cubicles – secondary connection design and commissioning |
“Consortium |
Golden sands” S/s 110/20kV - Reconstruction |
CarrefourAD |
Hermes ParkSofia – design of power supply of Trade Centre |
NEK EAD P “Trafoelektro - |
„Golden sands” S/s - 20kV Switchgear – circuit breakers replacement and Secondary connection – engineering works |
NEK EAD |
“Chervena Mogila” S/s–400kV Switchyard rehabilitation |
NEK EAD |
„TPPBobov Dol” S/s- 220кV Switchyard rehabilitation and 110kV Switchyard reconstruction |
NEK EAD |
„Chervena mogila”S/s- 400kV and 110kVSwitchyards – engineering of control panels |
NEK EAD |
„TPP Republika” – civil works - engineering |
NEK EAD, |
Bobov dol TPP - Rehabilitation of 220kV and 110kV switchyardsand construction of the new control room |
NEK EAD |
„Rousse” S/s 110/20 kV - 20 kV Switchgear – civil engineering works |